Information For:
  Astronomers
  Array Operators
  Data Analysts
  General Public

Useful Links:
  Very Long Baseline Array (VLBA)
  Latest NRAO News
  Image Gallery
  VLA Tours
November 2006 Modcomp turn off EVLA Status VLA Correlator system controller K band
October 2006 VLA phase jump problem Current maintenance problem EVLA status
October 2005 EVLA tests
September 2005 EVLA tests
August 2005 EVLA tests 200 MHz system
July 2005 EVLA tests 200 MHz system
June 2005 EVLA tests Polarization stability 200 MHz system Standard Field observation
May 2005 EVLA tests 196 MHz system Long Wavelength Demonstration Array
April 2005 EVLA efficiencies EVLA device tests EVLA pointing 196 MHz system
March 2005 EVLA Efficiencies 196 MHz system
February 2005 EVLA tests L band polarization
December 2004 EVLA tests Calibration models Water vapor radiometers
November 2004 Antenna 13 20cm efficiency Antenna 13 6cm efficiency Antenna 13 20cm fringes
October 2004 eVLA L band
September 2004 eVLA L band
July 2004 eVLA Pipelines
June 2004 eVLA
February 2004 eVLA Holography WVR Correlator controller
January 2004 eVLA WVR
October 2003 eVLA Linearity Polarization beams
September 2003 Polarization beams eVLA Archive retrieval
August 2003 eVLA Beam polarization 75 MHz with PT K and Q receivers
July 2003 eVLA Lightening Antenna 1 75 MHz
June 2003 eVLA Antenna 1 pointing
May 2003 eVLA WVR Bandpass stitching
April 2003 eVLA Correlator controller Holography Antenna 1 optics
March 2003 K band receivers eVLA Correlator controller
February 2003 K band polarization Iridium filters
January 2003 eVLA first LO Subreflector rotation
December 2001 K band Calib flux ratios Pointing
November 2001 Pointing WVR
October 2001 Dynamic range Fast phase variation Reference pointing Holography

Modified on Friday, 26-Sep-2008 12:09:34 MDT by Barry Clark