When the break is over and the stress sensors
are within the approved parameters, the transporter moves the base out from under the dish as everyone watches closely. |
 |
 |
When the transporter has moved the
base to its position under the crane, the crew makes sure it is
level. |  |
 |
The base remains on the transporter. A platform with a safety railing
is lifted on to the base so that the bearing and gearboxes can be
worked on safely.
|
The bottom of the dish is scraped
clean. |  |