When the break is over and the stress sensors are within the approved parameters, the transporter moves the base out from under the dish as everyone watches closely. The base moves further away
The base moves away
When the transporter has moved the base to its position under the crane, the crew makes sure it is level.Leveling the base
Raising the platform The base remains on the transporter. A platform with a safety railing is lifted on to the base so that the bearing and gearboxes can be worked on safely.
The bottom of the dish is scraped clean.Cleaning the bottom of the dish